From: route@monster.com
Sent: Thursday, April 07, 2016 11:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
BRENT PECK 4341 Thomas Drive Panama City Beach,
Fl. Phone: 850-819-4633 Email: brentpex@yahoo.com PROFESSIONAL SUMMARY_______________________________________
Thirteen
years of experience combined within project scheduling and planning. Results
driven leader with a consistent approach to problem solving, resource
planning, earned value management and forecasting. Training and experience
within relevant applications include:
PROFESSIONAL EXPERIENCE______________________________________ Datalis Solutions / Exelis (Oct. 2012 –
Present) Title: Master Program Scheduler · Assigned to existing programs for the Republic of Korea,
my primary focus was to re-model two engineering development schedules in order
to determine remaining work and establish accurate delivery dates. · Modeled and successfully implemented a fully functional
resource pool which allowed Program Managers to assign resources, review
over-allocations and adjust tasks as needed. · Continued work with business development which includes
the development of integrated master schedules for the purpose of capturing
contractual scopes of work (SOW) and WBS elements for proposals. · Performs monthly schedule metrics, maintains and updates
estimates to completion for monthly Schedule Performance Index (SPI), Cost
Performance Index (CPI) and Earned Value Management (EVM) Sparton Defense and Security (May 2011 –
Sept 2012) Title: Senior Program Scheduler · Responsible for the development of master program
schedules for the Navy (DOD) with primary focus on the Navy’s High Altitude
Anti-Submarine Warfare program (HAASW). · Successfully modeled and maintained a dynamic program
schedule for a joint venture between Sparton Defense and Ultra
Electronics-USSI. The program (ERAPSCO) required the use of a
fully-functional project schedule to track the progress of all engineering
efforts including mechanical and electrical design as well as software and
technical development. · Practiced utilization of Microsoft Project’s resource
sheet by including resources and task assignments which generated accurate
resource and group management reports. · Worked closely with business development and proposal
groups to model schedules which follow contracts scope of work (SOW) and work
breakdown structure (WBS). · Collaborated with NAVAIR Program Management to
model current and future schedules which allowed for better CLIN and CDRL
visibility and management. · Successfully built and integrated program bid schedule
templates for contracts and proposals Oceaneering Umbilical Solutions (January
2007-April 2011) Title: Senior Production Control Planner
and Project Scheduler · Responsible for the scheduling of project components,
capacity planning, machine utilization, and material planning. · Work directly with Project Management and Senior
Management to provide status of current projects. · Provide project scheduling conflicts, risks, and risk
mitigation to Senior Management, Project Management and Manufacturing. · Review project estimate, project budget, and monitor
current costs impacting the project through labor hours, run rates, and raw
material analysis. · Maintain traceability of all manufactured components throughout
multiple project processes. · Generate production work orders in MRP (PeopleSoft) for
all project components to be manufactured. · Develop Project Schedules to reflect WBS (Work Breakdown
Structure) for current projects along with bids & proposal scheduling. Honeywell International (1997-2005) Title: Operations Scheduling Coordinator,
Supervisor · Responsible for labor scheduling and capacity planning for
manufacturing of disc brake assemblies for Ford, GM, and Chrysler. · Facilitated quality control and lean manufacturing through
Root Cause Analysis projects. · Monitored and maintained all guidelines set by
Occupational Safety and Health Association (OSHA). · Supervised over fifty employees in order to meet customer
requirements and deadlines. · Responsible for meeting weekly deadlines for multiple
automotive customers. · Worked in “team” environments with engineering,
maintenance and accounting to help develop continuous improvement and lean
manufacturing. TRAINING & DEVELOPMENT_____________________________________ · Primavera P6 (R8) Training: CPM Solutions (Collaborative
Project Management) · Project Scheduling: Defense Acquisition University · Earned Value Management: Defense Acquisition University · Six Sigma Plus Green Belt: Honeywell · MS Project Orange Belt Training (PMI) · MS Project Advanced Certification (Gulf Coast State
College) · Uniform Project Management: Oceaneering · PeopleSoft Oracle: Global Core Team / Manufacturing:
Oceaneering Primavera P6 (R8) Skills & Development ×
Navigating
in Primavera P6 (Client Release 8) ×
Enterprise
Project Structure (EPS) ×
Project
Modeling / Creation ×
Developing
the Work Breakdown Structure ×
Resource
and Cost Management ×
Resource
Pool Development ×
Project
Plan Optimization ×
Creating
Baseline Projects ×
Updating
Project Status ×
Generation
Project Performance Reports EDUCATION_____________________________________________________ Gulf
Coast Community College: Surgical Technology August 2005-December 2006 - Surgical
Technology University
of Alabama/Huntsville 1996-1997 - Business Communication A.
Crawford Mosley High School – 1993 Diploma ACCREDITATIONS AND AWARDS_____________________________________ · 2013/14:
Successfully modeled and maintained multiple engineering program schedules
designed to support the development of new and existing integrated
minesweeping systems for domestic and foreign Navy’s. · 2011/12:
Successfully modeled and maintained a functional program schedule designed to
support the Navy’s High Altitude Anti-Submarine Warfare System. · 2010/12: Oceaneering:
Successfully integrated manufacturing and production work orders from
Peoplesoft MRP into the individual and master project schedules. · 2008: Microsoft
Project Advanced Certification · 2007: Oceaneering:
Developed first work instructions to include the process of creating,
maintaining, and closing production work orders in PeopleSoft. · 2007: Oceaneering:
Developed the first fully operational work center schedule for manufacturing. · 2005: Honeywell
International: Six Sigma Plus Greenbelt Certification REFERENCES____________________________________________________ · Tim Wyvratt, Program Manager, Sparton Defense
Contact: 386-985-1559 twyvratt@sparton.com · Dave Bruderick, Engineering Manager, Sparton Defense Contact:
386-985-1403 dbruderick@sparton.com · Chris Riley, Program Manager, Exelis Contact:
chris.riley@exelisinc.com · William “Ross” Malloy, Engineering Scheduler, Oceaneering
International
Contact: wmalloy@oceaneering.com · Don Pendarvis, Supplier Quality Engineer, Oceaneering
International Contact:
850-368-4437 dpendarvis@oceaneering.com · Scott Williams, Master Scheduler, Datalis Solutions
Contact: 850-630-0750, swilliams@datalissol.com |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|